Daily Activities

Lego Bot Head To Head Log

30 March - Hardware Team

  • Finished Phantom Bot - Status(offline) due to bad wire
  • Took pictures of mounts for future posting and commenting

30 March-Hannah

  • changed Liam's mav's to motor commands
  • set up position for line following
  • need to put in code for pushing down the bridge
  • test all angles and find acceptible angles for knocking down the bridge

29 March - Liam

  • Knocked over bridge with brakes
  • Gradual line follow over bridge almost complete
  • Fool-proof (for the most part)

27 March - ???

  • Ramp built
  • Drag Bar built on the back