Lego Bot Head To Head Log

Daily activities

Code Frozen

To Do:

Hardware

  • Create tribble skirt around the cup grabber
  • line followers 1) cliff following (navigation of the bridge) 2) regular line following (know when the bridge has ended)
  • brakes for staying in the opponents shelter
  • 180 degree sweep arm to sweep tribble and umbrella at stage one
  • nothing to stick or get caught on the tape
  • modify brakes to go around a blue cup

Software

  • be very fast
  • finish project X code
    • todo: rotate, thenput in code from beginning to find bridge line

Done:

  • 3/28/08
    • Wheel guards installed
  • 3/29/08
    • Strengthened the front arm
    • Improved the ramp
  • 4/4/08
    • finished the skeleton for the state machine
  • 4/5/08
    • started coding for the state machine
    • confirmed the first 3 states, to knocking down the board
    • Changed Servo Horn Position
  • 4/6/08
    • across bridge (15 POINTS)
    • confirmed 8 states
    • Fixed Top Hats
  • 4/7/08
    • big argument with mr gras about strategy
    • attempted to prove our (Liam's) side of the argument (fail)
    • 50% success rate not good
  • 4/12/08
  • wrote code to look for blue cup from bridge; however, it needs to be modified to include blob pixels further to the right (ie. greater than 50)
  • 4/15/08
    • fixed PhantomBot's problem of spinning before knocking down the bridge
    • refined the final drive into opponent's shelter
    • consistently got LegoBot into opponent's shelter with satellite and plant(green tribble)
  • 4/18/08
    • Added mount for Project X
    • Light sensor added
    • Moved servo connection up a peg on the arm for more Project X possibilities (original connection was restricting how we connected Project X)
  • 4/20/08
    • Reviewed code
    • Updated comments
    • Refactored some code
  • 4/21/08
    • refined Project X launch mechanism
  • 4/24/08
    • refined the docking programing so it lines up straight
    • labeled cables
  • 4/24/08
    • worked on project X deployment
  • 4/27/08
    • worked on project X
    • project X code works; need to find bridge line and continue with the rest of the program
  • 4/29/08
    • fixed the project X deployment so it actually works (95%)
    • occasionally the cord for project X gets stuck on some of the other cables, possibilities are limitless
    • tribble trouble (mess with two closest piles of tribbles) works effectively
    • small refinement needed to make code 100%
    • Code Frozen
  • 6/1/08
    • Code Thawed
    • Now we cliff follow with ET sensor, works great
    • started wall following, takes total of 30 seconds to get to corner of opp side.
  • 6/5/08
    • Knock off our umbrellas
    • Knock off green tribble from opponent's solarium